5L Cuprinol 5 Star Complete Wood Treatment.
Features:
All surfaces should be clean, dry and free from dirt, debris and other contaminates.
Minimum of 2/3 coats required.
Ensure timber is fully dry (allow 3 days) before laying plastic floor tiles, foam and rubber-backed carpets, loft insulation etc.
Treatment will typically dry in 1-3 days.